Scholarly open access journals, Peer-reviewed, and Refereed Journals, Impact factor 8.14 (Calculate by google scholar and Semantic Scholar | AI-Powered Research Tool) , Multidisciplinary, Monthly, Indexing in all major database & Metadata, Citation Generator, Digital Object Identifier(DOI)
A project entitled “ Factors affecting on labour productivity in construction industry of North- East
Haryana” was conducted during summer 2022 at Bhakra Water Services I&WR Deptt. Haryana The main goals
of this study, is to identify and rank the factors affecting labor productivity in Haryana State, with geographical
area of 4.4 Million Hectares located in North-Western part of India, is mostly arid and semi arid with limited
rain fall ranging from 300mm in the South-West to 1100mm in the North-East. The State constitutes 1.35% of
total area of the country and has little over 2.09% of the total population of the country. The economy of the
State is primarily depends on agriculture. Agriculture is the primary sector of the State economy and majority of
the population is directly or indirectly dependent on agriculture and its allied activities. Accordingly, State has
accorded high priority to agriculture since its creation on 1 st November 1966. The strong infrastructure facility
like metal roads, extensive network of canals, Rural electrification, development of Market yards etc. were
created which provided much needed impetus to agriculture development in the State. Creation of these
facilities coupled with agriculture research support and excellent extension network to disseminate the
information related to improved farm practices for farmers yielded tangible results. The State has been
converted from a food despite to a food surplus State. The State has become the 2nd highest largest contributor
of food grains to the central pool and has contributed about 15.6% of food grains to the central pool despite of a
very less area of 1.4% area of country. To determine the objective of questionnaire survey the demographic
information has obtained such as Name of company, profession, Working experience, Qualification. The
questionnaire contained 29 factors and distribute among site engineers as per rate scale between 1 to 5. To set
the format Questionnaire survey has arranged into following categories such as (1). Human labor, (2). Site and
resource management, (3). Workforce characteristic, (4). Payment Delay, (5). External characteristic factors.
The data analysis during survey 45 questioner distributed among site engineers on construction site and data
obtained through RII (Relative important index) method and by ranking factors which showed result as (1).
Strength and physical structure of labor, (2). Clarity of communication on site, (3). Shortage of skilled
construction workers, (4). Quality experience and training, (5). Morality. This result obtained, help to fill a gap
in knowledge of factors affecting labour productivity and develop more in depth perspective of factors
influencing the efficiency of operatives. This study has gained more recommendation for several construction
manager and provide awareness to improve labour productivity in construction projects
Keywords:
Labor productivity, Relative Importance Index, Rank construction project, performance Delay
Cite Article:
"Labour productivity analysis in India construction industry and Rii method ", International Journal of Science & Engineering Development Research (www.ijrti.org), ISSN:2455-2631, Vol.7, Issue 7, page no.353 - 360, July-2022, Available :http://www.ijrti.org/papers/IJRTI2207051.pdf
Downloads:
000204892
ISSN:
2456-3315 | IMPACT FACTOR: 8.14 Calculated By Google Scholar| ESTD YEAR: 2016
An International Scholarly Open Access Journal, Peer-Reviewed, Refereed Journal Impact Factor 8.14 Calculate by Google Scholar and Semantic Scholar | AI-Powered Research Tool, Multidisciplinary, Monthly, Multilanguage Journal Indexing in All Major Database & Metadata, Citation Generator