IJRTI
International Journal for Research Trends and Innovation
International Peer Reviewed & Refereed Journals, Open Access Journal
ISSN Approved Journal No: 2456-3315 | Impact factor: 8.14 | ESTD Year: 2016
Scholarly open access journals, Peer-reviewed, and Refereed Journals, Impact factor 8.14 (Calculate by google scholar and Semantic Scholar | AI-Powered Research Tool) , Multidisciplinary, Monthly, Indexing in all major database & Metadata, Citation Generator, Digital Object Identifier(DOI)

Call For Paper

For Authors

Forms / Download

Published Issue Details

Editorial Board

Other IMP Links

Facts & Figure

Impact Factor : 8.14

Issue per Year : 12

Volume Published : 11

Issue Published : 117

Article Submitted : 21305

Article Published : 8476

Total Authors : 22301

Total Reviewer : 802

Total Countries : 156

Indexing Partner

Licence

This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License
Published Paper Details
Paper Title: Appraisal of risk factors affecting performance on road projects
Authors Name: Chipozya Tembo , Shastry , Franco
Download E-Certificate: Download
Author Reg. ID:
IJRTI_206165
Published Paper Id: IJRTI2509070
Published In: Volume 10 Issue 9, September-2025
DOI:
Abstract: Road construction is the economic driver of many economies, especially in developing countries. For this reason, the Zambian government has prioritized road construction for the last twelve years. Road construction is usually complex and experiences more risks than most construction projects. The resultant effects of risks on road projects are cost escalation, time overruns, quality shortfalls, and project abandonment. A positivist approach was used to uncover the risks faced, the impacts, and the severity of the risks. A questionnaire survey was conducted for contractors involved in road construction in the Zambian Construction Industry and consultants in the public and private sectors. A total of 62 questionnaires were sent to the contractors,’ private consulting bodies, and public consultants. The sampling for contractors was through snowballing and purposive sampling for consultants engaged in road construction. In total, the received responses were 33, with 23 being from consultants and 10 from contractors. The analysis was done through descriptive statistics and the relative importance index. The results established that risks are prevalent within the Zambian road sector, as more than 85% of the risks on the questionnaire were noted to be above the average R.I.I. in their frequency of occurrence and severity, indicating their prevalence. The top five of the risks are inflation rate fluctuation, exchange rate fluctuation, delayed payment, delayed subcontracted work and delayed approvals. The consequences of the risks showed that the R.I.I. was above the average, thus showing just how dire they are. The top three consequences of experienced risks are cost overruns, project abandonment and time overruns. The prevalence of risks necessitates better risk management by all project participants, especially for managerial risk during the construction phase, which is mainly internal.
Keywords: Impacts, nature, road, risks factors, risk owner severity, Zambia
Cite Article: "Appraisal of risk factors affecting performance on road projects", International Journal for Research Trends and Innovation (www.ijrti.org), ISSN:2455-2631, Vol.10, Issue 9, page no.a619-a628, September-2025, Available :http://www.ijrti.org/papers/IJRTI2509070.pdf
Downloads: 0001383
ISSN: 2456-3315 | IMPACT FACTOR: 8.14 Calculated By Google Scholar| ESTD YEAR: 2016
An International Scholarly Open Access Journal, Peer-Reviewed, Refereed Journal Impact Factor 8.14 Calculate by Google Scholar and Semantic Scholar | AI-Powered Research Tool, Multidisciplinary, Monthly, Multilanguage Journal Indexing in All Major Database & Metadata, Citation Generator
Publication Details: Published Paper ID: IJRTI2509070
Registration ID:206165
Published In: Volume 10 Issue 9, September-2025
DOI (Digital Object Identifier):
Page No: a619-a628
Country: Kitwe, Copperbelt, Zambia
Research Area: Civil Engineering 
Publisher : IJ Publication
Published Paper URL : https://www.ijrti.org/viewpaperforall?paper=IJRTI2509070
Published Paper PDF: https://www.ijrti.org/papers/IJRTI2509070
Share Article:

Click Here to Download This Article

Article Preview
Click Here to Download This Article

Major Indexing from www.ijrti.org
Google Scholar ResearcherID Thomson Reuters Mendeley : reference manager Academia.edu
arXiv.org : cornell university library Research Gate CiteSeerX DOAJ : Directory of Open Access Journals
DRJI Index Copernicus International Scribd DocStoc

ISSN Details

ISSN: 2456-3315
Impact Factor: 8.14 and ISSN APPROVED, Journal Starting Year (ESTD) : 2016

DOI (A digital object identifier)


Providing A digital object identifier by DOI.ONE
How to Get DOI?

Conference

Open Access License Policy

This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License

Creative Commons License This material is Open Knowledge This material is Open Data This material is Open Content

Important Details

Join RMS/Earn 300

IJRTI

WhatsApp
Click Here

Indexing Partner